Upcoming Projects

Summer and Fall 2018

  1. The Board is requesting bids to terrace the hill in the front of the building to prevent further and continuing erosion and, in a joint effort with 270 Bronxville Road, to repair the wall between the buildings.
  2. The Board is planning to repair the terrace between the parking garage and Bronxville Road.